Case Study of Project H – Bay Window Alteration for a House

Category: Building

The clients wanted to replace the flat roof on their bay window to be a half pitched roof. Our process started by surveying the job and measuring the window. We also started our research into the tiles required to match the existing building.

Once we completed our survey we appointed a structural engineer to create some drawings for the works. Which we then used to create the roof structure.

Once the roof structure was complete, the next stage was to install the roof finish. This was done by a specialist contractor which we arranged as our role as principal contractor. 

The final result can be seen below:

More Projects

Case Study of Project D – Loft Conversion at a House

Building

Case Study of Project B – Grade I Listed Building Renovation

Building

Case Study of Project G – Two Storey Garage Conversion

Building

Case Study of Project C – Internal Remodelling of a House

Building
Case Study of Project C – Internal Remodelling of a House